NEVI Build-Out Texas

Texas NEVI Build-Out

Every NEVI-funded charging site in Texas, from grant award to first charge. Part of the regional NEVI tracker.

19
Sites tracked
19
Live
0
Under construction
76
Planned ports

Texas's NEVI pipeline is at an earlier stage — sites here are moving from award to permitting to construction, and expected live dates should be treated as approximate. The pattern matches the program's purpose: corridor gaps with real traffic and thin commercial incentive.

New to the program? Start with NEVI Explained — what the $5 billion program requires (97% uptime, four 150 kW ports minimum), why it paused and restarted in 2025, and how to tell if a station is NEVI-funded.

Texas Sites

Location Corridor Operator Ports Power Status Expected Live Source
Balmorhea SWTCH 4 250 kW live † 2025-06-30 Source →
Big Spring eVgo Network 4 150 kW live † 2025-05-29 Source →
Clyde FCN 4 250 kW live † 2025-07-01 Source →
Colorado City FCN 4 250 kW live † 2025-04-24 Source →
Cotulla Tesla 8 250 kW live † 2024-12-23 Source →
Encinal ChargePoint Network 2 250 kW live † 2025-12-19 Source →
Encinal ChargePoint Network 2 250 kW live † 2025-12-19 Source →
Fort Worth SWTCH 4 250 kW live † 2025-12-30 Source →
Gainesville Tesla 12 250 kW live † 2024-12-11 Source →
Happy SWTCH 4 250 kW live † 2024-11-26 Source →
Junction eVgo Network 4 150 kW live † 2026-03-13 Source →
Natalia ChargePoint Network 2 250 kW live † 2025-12-13 Source →
Natalia ChargePoint Network 2 250 kW live † 2025-12-13 Source →
Plainview FCN 4 250 kW live † 2025-03-28 Source →
Santo FCN 8 250 kW live † 2025-09-25 Source →
Three Rivers ChargePoint Network 2 250 kW live † 2026-01-23 Source →
Three Rivers ChargePoint Network 2 250 kW live † 2026-01-23 Source →
Van ChargePoint Network 2 250 kW live † 2026-05-30 Source →
Van ChargePoint Network 2 250 kW live † 2026-05-30 Source →

Data sources and methodology

Site list sourced from state DOT NEVI program pages and FHWA grant records, cross-checked against the NREL Alternative Fuels Station Locator. Status verified monthly. Expected live dates are official estimates and regularly slip 3–12 months. Last data check: August 2026. For scoring methodology across the site, see how we measure. Related: Texas EV charging hub · Q3 2026 regional status report.

= station auto-added from NREL's funding_sources: NEVI tag, not editorially verified against state DOT records. Hand-curated entries take precedence.