NEVI Build-Out Maine
Maine NEVI Build-Out
Every NEVI-funded charging site in Maine, from grant award to first charge. Part of the regional NEVI tracker.
Maine's NEVI pipeline is at an earlier stage — sites here are moving from award to permitting to construction, and expected live dates should be treated as approximate. The pattern matches the program's purpose: corridor gaps with real traffic and thin commercial incentive.
New to the program? Start with NEVI Explained — what the $5 billion program requires (97% uptime, four 150 kW ports minimum), why it paused and restarted in 2025, and how to tell if a station is NEVI-funded.
Maine Sites
| Location | Corridor | Operator | Ports | Power | Status | Expected Live | Source |
|---|---|---|---|---|---|---|---|
| Augusta | — | Tesla | 16 | 250 kW | live † | 2024-10-04 | Source → |
| Bangor | — | JULE | 4 | 250 kW | live † | 2026-03-25 | Source → |
| Brunswick | — | Non-Networked | 4 | 250 kW | live † | 2025-08-07 | Source → |
| Portland | — | JULE | 4 | 250 kW | live † | 2026-01-14 | Source → |
| Rockland | — | Tesla | 8 | 250 kW | live † | 2024-03-20 | Source → |
| Rumford | — | EV Connect | 8 | 250 kW | live † | 2025-10-31 | Source → |
| Searsport | — | Non-Networked | 4 | 250 kW | live † | 2025-07-03 | Source → |
| Windham | — | JULE | 4 | 250 kW | live † | 2026-03-25 | Source → |
Data sources and methodology
Site list sourced from state DOT NEVI program pages and FHWA grant records, cross-checked against the NREL Alternative Fuels Station Locator. Status verified monthly. Expected live dates are official estimates and regularly slip 3–12 months. Last data check: August 2026. For scoring methodology across the site, see how we measure. Related: Maine EV charging hub · Q3 2026 regional status report.
† = station auto-added from NREL's funding_sources: NEVI tag, not editorially verified against state DOT records. Hand-curated entries take precedence.